chore: final verification docs for milestone/label CRUD batch #278

Owner

Completes the final step of issue #28: documents the milestone/label CRUD batch (issues #18–#27) in extensions/forgejo/task_plan.md and progress.md, mirroring how Phases 0–6 were documented.

Changes

  • task_plan.md — new ## Phase 9 — Milestone CRUD + Label Create section with 13 rows (9.1–9.13) matching the task breakdown in implementation-plan-milestones-labels.md; every row verified complete and tested. Header updated to name both source plans and note where Phases 7–8 (Actions tooling) are tracked.
  • progress.md — new "Session 9" narrative entry summarizing the batch: createLabel(), the 7 milestone functions in the new src/milestones.ts, tool registration + formatMilestone(), promptGuidelines cross-references, README/DESIGN updates, and final verification.

Numbering note

The batch's plan file calls this work "Phase 7", but phases 7–8 were already taken by the Actions tooling in progress.md and docs/IMPLEMENTATION_PLAN.md, so it is documented as Phase 9 (issue #28 explicitly allows adjusting numbering to match what was actually delivered).

Verification (per #28 acceptance criteria)

  • npm test: 259/259 passed, 11 suites, zero failures/skips
  • npm run check: clean
  • Coverage: src/milestones.ts and src/issues.ts at 100% statements/branches/functions/lines
  • Tool-count consistency: 37 registered tools in src/index.ts = "~37 tools" in docs/DESIGN.md (the "31 tools" predicted in #28 predates the 5-tool Actions batch)
  • promptGuidelines cross-references present on forgejo_issue_create and forgejo_pr_create
  • No TODO/stub code or skipped tests related to the batch

Closes #28

Completes the final step of issue #28: documents the milestone/label CRUD batch (issues #18–#27) in `extensions/forgejo/task_plan.md` and `progress.md`, mirroring how Phases 0–6 were documented. ## Changes - **task_plan.md** — new `## Phase 9 — Milestone CRUD + Label Create` section with 13 rows (9.1–9.13) matching the task breakdown in `implementation-plan-milestones-labels.md`; every row verified complete and tested. Header updated to name both source plans and note where Phases 7–8 (Actions tooling) are tracked. - **progress.md** — new "Session 9" narrative entry summarizing the batch: `createLabel()`, the 7 milestone functions in the new `src/milestones.ts`, tool registration + `formatMilestone()`, promptGuidelines cross-references, README/DESIGN updates, and final verification. ## Numbering note The batch's plan file calls this work "Phase 7", but phases 7–8 were already taken by the Actions tooling in `progress.md` and `docs/IMPLEMENTATION_PLAN.md`, so it is documented as **Phase 9** (issue #28 explicitly allows adjusting numbering to match what was actually delivered). ## Verification (per #28 acceptance criteria) - `npm test`: 259/259 passed, 11 suites, zero failures/skips - `npm run check`: clean - Coverage: `src/milestones.ts` and `src/issues.ts` at 100% statements/branches/functions/lines - Tool-count consistency: 37 registered tools in `src/index.ts` = "~37 tools" in `docs/DESIGN.md` (the "31 tools" predicted in #28 predates the 5-tool Actions batch) - promptGuidelines cross-references present on `forgejo_issue_create` and `forgejo_pr_create` - No TODO/stub code or skipped tests related to the batch Closes #28
david merged commit 97b94cc2a1 into main 2026-09-18 03:43:42 +00:00
david deleted branch chore/2026-09-18/final-verification-milestone-label-crud-full-suite-green-task-plan-md-update 2026-09-18 03:43:42 +00:00
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
david/pi-extensions-and-skills!278
No description provided.